Industries
Industry Name: Metals Manufacturing
Average Kw: 2500
XCustomer Company Sector Lev1: Manufacturing
XCustomer Company Sector Lev2: Metals Manufacturing
Curtailment Strategy: shut off equipment, including electric arc furnaces, forging presses and peripheral equipment, and compressors, heating units, and chillers.
Curtailment Description: The average Metals Manufacturing customer can curtail 2500 kW during a demand response event. To meet their demand reduction targets, many Metals Manufacturing facilities shut off equipment, including electric arc furnaces, forging presses and peripheral equipment, and compressors, heating units, and chillers. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Average Kw: 2500
XCustomer Company Sector Lev1: Manufacturing
XCustomer Company Sector Lev2: Metals Manufacturing
Curtailment Strategy: shut off equipment, including electric arc furnaces, forging presses and peripheral equipment, and compressors, heating units, and chillers.
Curtailment Description: The average Metals Manufacturing customer can curtail 2500 kW during a demand response event. To meet their demand reduction targets, many Metals Manufacturing facilities shut off equipment, including electric arc furnaces, forging presses and peripheral equipment, and compressors, heating units, and chillers. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Industry Name: Plastics & Rubber
Average Kw: 1600
XCustomer Company Sector Lev1: Manufacturing
XCustomer Company Sector Lev2: Plastics and Rubber Manufacturing
Curtailment Strategy: curtail blow molding and injection molding equipment; shut down extruders, grinders, and thermoforming equipment; and turn off compressors, chillers, and process pumps.
Curtailment Description: The average Plastics & Rubber customer can curtail 1600 kW during a demand response event. To meet their demand reduction targets, many Plastics & Rubber facilities curtail blow molding and injection molding equipment; shut down extruders, grinders, and thermoforming equipment; and turn off compressors, chillers, and process pumps. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Average Kw: 1600
XCustomer Company Sector Lev1: Manufacturing
XCustomer Company Sector Lev2: Plastics and Rubber Manufacturing
Curtailment Strategy: curtail blow molding and injection molding equipment; shut down extruders, grinders, and thermoforming equipment; and turn off compressors, chillers, and process pumps.
Curtailment Description: The average Plastics & Rubber customer can curtail 1600 kW during a demand response event. To meet their demand reduction targets, many Plastics & Rubber facilities curtail blow molding and injection molding equipment; shut down extruders, grinders, and thermoforming equipment; and turn off compressors, chillers, and process pumps. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Industry Name: Chemicals & Petrochemicals
Average Kw: 2000
XCustomer Company Sector Lev1: Manufacturing
XCustomer Company Sector Lev2: Chemicals and Petrochemicals
Curtailment Strategy: shut down blenders, agitators, and support equipment such as chillers, pumps, and compressors. 20% of Chemicals & Pharmaceuticals facilities use backup generation to participate in demand response (where permitted by state and local regulations.)
Curtailment Description: The average Chemicals & Petrochemicals customer can curtail 2000 kW during a demand response event. To meet their demand reduction targets, many Chemicals & Petrochemicals facilities shut down blenders, agitators, and support equipment such as chillers, pumps, and compressors. 20% of Chemicals & Petrochemicals facilities use backup generation to participate in demand response (where permitted by state and local regulations.) The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Average Kw: 2000
XCustomer Company Sector Lev1: Manufacturing
XCustomer Company Sector Lev2: Chemicals and Petrochemicals
Curtailment Strategy: shut down blenders, agitators, and support equipment such as chillers, pumps, and compressors. 20% of Chemicals & Pharmaceuticals facilities use backup generation to participate in demand response (where permitted by state and local regulations.)
Curtailment Description: The average Chemicals & Petrochemicals customer can curtail 2000 kW during a demand response event. To meet their demand reduction targets, many Chemicals & Petrochemicals facilities shut down blenders, agitators, and support equipment such as chillers, pumps, and compressors. 20% of Chemicals & Petrochemicals facilities use backup generation to participate in demand response (where permitted by state and local regulations.) The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Industry Name: Mining & Quarrying
Average Kw: 5000
XCustomer Company Sector Lev1: Agriculture and Mining
XCustomer Company Sector Lev2: Mining and Quarrying
Curtailment Strategy: turn off crushers, compressors, dewatering pumps, and other ancillary equipment; shut down all non-essential ventilation fans and lighting; and idle any active conveyor belts.
Curtailment Description: The average Mining & Quarrying customer can curtail 5000 kW during a demand response event. To meet their demand reduction targets, many Mining & Quarrying facilities turn off crushers, compressors, dewatering pumps, and other ancillary equipment; shut down all non-essential ventilation fans and lighting; and idle any active conveyor belts. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Average Kw: 5000
XCustomer Company Sector Lev1: Agriculture and Mining
XCustomer Company Sector Lev2: Mining and Quarrying
Curtailment Strategy: turn off crushers, compressors, dewatering pumps, and other ancillary equipment; shut down all non-essential ventilation fans and lighting; and idle any active conveyor belts.
Curtailment Description: The average Mining & Quarrying customer can curtail 5000 kW during a demand response event. To meet their demand reduction targets, many Mining & Quarrying facilities turn off crushers, compressors, dewatering pumps, and other ancillary equipment; shut down all non-essential ventilation fans and lighting; and idle any active conveyor belts. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Industry Name: Concrete & Glass
Average Kw: 1000
XCustomer Company Sector Lev1: Manufacturing
XCustomer Company Sector Lev2: Concrete, Glass, and Building Materials
Curtailment Strategy: implement a full shutdown of processing facilities or a specific production line, such as a mill and crushing systems. Many facilities curtail furnaces and blowers and idle conveyors and crushing and screen equipment.
Curtailment Description: The average Concrete & Glass customer can curtail 1000 kW during a demand response event. To meet their demand reduction targets, many Concrete & Glass facilities implement a full shutdown of processing facilities or a specific production line, such as a mill and crushing systems. Many facilities curtail furnaces and blowers and idle conveyors and crushing and screen equipment. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Average Kw: 1000
XCustomer Company Sector Lev1: Manufacturing
XCustomer Company Sector Lev2: Concrete, Glass, and Building Materials
Curtailment Strategy: implement a full shutdown of processing facilities or a specific production line, such as a mill and crushing systems. Many facilities curtail furnaces and blowers and idle conveyors and crushing and screen equipment.
Curtailment Description: The average Concrete & Glass customer can curtail 1000 kW during a demand response event. To meet their demand reduction targets, many Concrete & Glass facilities implement a full shutdown of processing facilities or a specific production line, such as a mill and crushing systems. Many facilities curtail furnaces and blowers and idle conveyors and crushing and screen equipment. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Industry Name: Paper & Paper Products
Average Kw: 2000
XCustomer Company Sector Lev1: Manufacturing
XCustomer Company Sector Lev2: Paper and Paper Products
Curtailment Strategy: implement a full shutdown of plant operations, including major motors, refiners, pumps, and blowers; or shut down select paper machines, production lines, and compressors.
Curtailment Description: The average Paper & Paper Products customer can curtail 2000 kW during a demand response event. To meet their demand reduction targets, many Paper & Paper Products facilities implement a full shutdown of plant operations, including major motors, refiners, pumps, and blowers; or shut down select paper machines, production lines, and compressors. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Average Kw: 2000
XCustomer Company Sector Lev1: Manufacturing
XCustomer Company Sector Lev2: Paper and Paper Products
Curtailment Strategy: implement a full shutdown of plant operations, including major motors, refiners, pumps, and blowers; or shut down select paper machines, production lines, and compressors.
Curtailment Description: The average Paper & Paper Products customer can curtail 2000 kW during a demand response event. To meet their demand reduction targets, many Paper & Paper Products facilities implement a full shutdown of plant operations, including major motors, refiners, pumps, and blowers; or shut down select paper machines, production lines, and compressors. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Industry Name: Lumber & Wood Products
Average Kw: 1000
XCustomer Company Sector Lev1: Manufacturing
XCustomer Company Sector Lev2: Lumber
Curtailment Strategy: implement a full shutdown of miller operations, or shut down specific production lines, including lumber kilns, sanders, and moulders.
Curtailment Description: The average Lumber & Wood Products customer can curtail 1000 kW during a demand response event. To meet their demand reduction targets, many Lumber & Wood Products facilities implement a full shutdown of miller operations, or shut down specific production lines, including lumber kilns, sanders, and moulders. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Average Kw: 1000
XCustomer Company Sector Lev1: Manufacturing
XCustomer Company Sector Lev2: Lumber
Curtailment Strategy: implement a full shutdown of miller operations, or shut down specific production lines, including lumber kilns, sanders, and moulders.
Curtailment Description: The average Lumber & Wood Products customer can curtail 1000 kW during a demand response event. To meet their demand reduction targets, many Lumber & Wood Products facilities implement a full shutdown of miller operations, or shut down specific production lines, including lumber kilns, sanders, and moulders. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Industry Name: Food & Beverage Manufacturing
Average Kw: 1500
XCustomer Company Sector Lev1: Manufacturing
XCustomer Company Sector Lev2: Food and Beverage Product Manufacturing and Packaging
Curtailment Strategy: shut off large motor load processes and delay starting lines, and reduce refrigeration compressor load or adjust set points in cold and frozen storage. 20% of Food & Beverage Manufacturers use backup generation to participate in demand response (where permitted by state and local regulations.)
Curtailment Description: The average Food & Beverage Manufacturing customer can curtail 1500 kW during a demand response event. To meet their demand reduction targets, many Food & Beverage Manufacturing facilities shut off large motor load processes and delay starting lines, and reduce refrigeration compressor load or adjust set points in cold and frozen storage. 20% of Food & Beverage Manufacturers use backup generation to participate in demand response (where permitted by state and local regulations.) The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Average Kw: 1500
XCustomer Company Sector Lev1: Manufacturing
XCustomer Company Sector Lev2: Food and Beverage Product Manufacturing and Packaging
Curtailment Strategy: shut off large motor load processes and delay starting lines, and reduce refrigeration compressor load or adjust set points in cold and frozen storage. 20% of Food & Beverage Manufacturers use backup generation to participate in demand response (where permitted by state and local regulations.)
Curtailment Description: The average Food & Beverage Manufacturing customer can curtail 1500 kW during a demand response event. To meet their demand reduction targets, many Food & Beverage Manufacturing facilities shut off large motor load processes and delay starting lines, and reduce refrigeration compressor load or adjust set points in cold and frozen storage. 20% of Food & Beverage Manufacturers use backup generation to participate in demand response (where permitted by state and local regulations.) The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Industry Name: Other Manufacturing
Average Kw: 1500
XCustomer Company Sector Lev1: Manufacturing
XCustomer Company Sector Lev2: Manufacturing Other
Curtailment Strategy: implement a full shutdown of facility operations, or turn off specific production lines, including ancillary equipment.
Curtailment Description: The average manufacturing customer can curtail 1500 kW during a demand response event. To meet their demand reduction targets, many manufacturing facilities implement a full shutdown of facility operations, or turn off specific production lines, including ancillary equipment. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Average Kw: 1500
XCustomer Company Sector Lev1: Manufacturing
XCustomer Company Sector Lev2: Manufacturing Other
Curtailment Strategy: implement a full shutdown of facility operations, or turn off specific production lines, including ancillary equipment.
Curtailment Description: The average manufacturing customer can curtail 1500 kW during a demand response event. To meet their demand reduction targets, many manufacturing facilities implement a full shutdown of facility operations, or turn off specific production lines, including ancillary equipment. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Industry Name: Refrigerated Storage
Average Kw: 700
XCustomer Company Sector Lev1: Transportation and Storage
XCustomer Company Sector Lev2: Refrigerated Storage
Curtailment Strategy: shut down refrigeration compressors, evaporators, freezers, and HVAC operations; turn off blast freezer fans, heat pumps, and fan motors; and reduce all non-essential lighting and other equipment.
Curtailment Description: The average Refrigerated Storage customer can curtail 700 kW during a demand response event. To meet their demand reduction targets, many Refrigerated Storage facilities shut down refrigeration compressors, evaporators, freezers, and HVAC operations; turn off blast freezer fans, heat pumps, and fan motors; and reduce all non-essential lighting and other equipment. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Average Kw: 700
XCustomer Company Sector Lev1: Transportation and Storage
XCustomer Company Sector Lev2: Refrigerated Storage
Curtailment Strategy: shut down refrigeration compressors, evaporators, freezers, and HVAC operations; turn off blast freezer fans, heat pumps, and fan motors; and reduce all non-essential lighting and other equipment.
Curtailment Description: The average Refrigerated Storage customer can curtail 700 kW during a demand response event. To meet their demand reduction targets, many Refrigerated Storage facilities shut down refrigeration compressors, evaporators, freezers, and HVAC operations; turn off blast freezer fans, heat pumps, and fan motors; and reduce all non-essential lighting and other equipment. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Industry Name: Healthcare
Average Kw: 1200
XCustomer Company Sector Lev1: Healthcare, Pharmaceuticals and Biotech
XCustomer Company Sector Lev2:
Curtailment Strategy: use backup generation to participate in demand response (where permitted by state and local regulations). Enel X helps hospitals and other healthcare facilities upgrade their backup generators to enroll their facilities' full electric load in demand response without violating environmental regulations.
Curtailment Description: The average Healthcare customer can curtail 1200 kW during a demand response event. To meet their demand reduction targets, many Healthcare facilities use backup generation to participate in demand response (where permitted by state and local regulations). Enel X helps hospitals and other healthcare facilities upgrade their backup generators to enroll their facilities' full electric load in demand response without violating environmental regulations. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Average Kw: 1200
XCustomer Company Sector Lev1: Healthcare, Pharmaceuticals and Biotech
XCustomer Company Sector Lev2:
Curtailment Strategy: use backup generation to participate in demand response (where permitted by state and local regulations). Enel X helps hospitals and other healthcare facilities upgrade their backup generators to enroll their facilities' full electric load in demand response without violating environmental regulations.
Curtailment Description: The average Healthcare customer can curtail 1200 kW during a demand response event. To meet their demand reduction targets, many Healthcare facilities use backup generation to participate in demand response (where permitted by state and local regulations). Enel X helps hospitals and other healthcare facilities upgrade their backup generators to enroll their facilities' full electric load in demand response without violating environmental regulations. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Industry Name: Primary and Secondary School
Average Kw: 250
XCustomer Company Sector Lev1: Education
XCustomer Company Sector Lev2: Elementary and Secondary Schools
Curtailment Strategy: raise thermostat set points by 4-6 degrees; dim lighting in common areas, hallways, and unoccupied spaces; and restrict energy loads such as dishwashers and hot water use.
Curtailment Description: The average Primary and Secondary School customer can curtail 250 kW during a demand response event. To meet their demand reduction targets, many Primary and Secondary School facilities raise thermostat set points by 4-6 degrees; dim lighting in common areas, hallways, and unoccupied spaces; and restrict energy loads such as dishwashers and hot water use. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Average Kw: 250
XCustomer Company Sector Lev1: Education
XCustomer Company Sector Lev2: Elementary and Secondary Schools
Curtailment Strategy: raise thermostat set points by 4-6 degrees; dim lighting in common areas, hallways, and unoccupied spaces; and restrict energy loads such as dishwashers and hot water use.
Curtailment Description: The average Primary and Secondary School customer can curtail 250 kW during a demand response event. To meet their demand reduction targets, many Primary and Secondary School facilities raise thermostat set points by 4-6 degrees; dim lighting in common areas, hallways, and unoccupied spaces; and restrict energy loads such as dishwashers and hot water use. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Industry Name: University
Average Kw: 950
XCustomer Company Sector Lev1: Education
XCustomer Company Sector Lev2: Colleges and Universities
Curtailment Strategy: use BMS software to raise thermostat set points; shut down HVAC chillers, boilers, and air handlers; and turn off or dim lighting in common areas and unoccupied spaces.
Curtailment Description: The average University customer can curtail 950 kW during a demand response event. To meet their demand reduction targets, many University facilities use BMS software to raise thermostat set points; shut down HVAC chillers, boilers, and air handlers; and turn off or dim lighting in common areas and unoccupied spaces. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Average Kw: 950
XCustomer Company Sector Lev1: Education
XCustomer Company Sector Lev2: Colleges and Universities
Curtailment Strategy: use BMS software to raise thermostat set points; shut down HVAC chillers, boilers, and air handlers; and turn off or dim lighting in common areas and unoccupied spaces.
Curtailment Description: The average University customer can curtail 950 kW during a demand response event. To meet their demand reduction targets, many University facilities use BMS software to raise thermostat set points; shut down HVAC chillers, boilers, and air handlers; and turn off or dim lighting in common areas and unoccupied spaces. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Industry Name: Commercial Real Estate
Average Kw: 500
XCustomer Company Sector Lev1: Real Estate and Construction
XCustomer Company Sector Lev2: Commercial Real Estate/Property Leasing and Management
Curtailment Strategy: use BMS software to raise thermostat set points; shut down HVAC chillers, boilers, and air handlers; and turn off or dim lighting in common areas and unoccupied spaces.
Curtailment Description: The average Commercial Real Estate customer can curtail 500 kW during a demand response event. To meet their demand reduction targets, many Commercial Real Estate facilities use BMS software to raise thermostat set points; shut down HVAC chillers, boilers, and air handlers; and turn off or dim lighting in common areas and unoccupied spaces. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Average Kw: 500
XCustomer Company Sector Lev1: Real Estate and Construction
XCustomer Company Sector Lev2: Commercial Real Estate/Property Leasing and Management
Curtailment Strategy: use BMS software to raise thermostat set points; shut down HVAC chillers, boilers, and air handlers; and turn off or dim lighting in common areas and unoccupied spaces.
Curtailment Description: The average Commercial Real Estate customer can curtail 500 kW during a demand response event. To meet their demand reduction targets, many Commercial Real Estate facilities use BMS software to raise thermostat set points; shut down HVAC chillers, boilers, and air handlers; and turn off or dim lighting in common areas and unoccupied spaces. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Industry Name: Retail
Average Kw: 250
XCustomer Company Sector Lev1: Retail
XCustomer Company Sector Lev2:
Curtailment Strategy: raise thermostat set points and turn off or dim lighting in common areas and unoccupied spaces.
Curtailment Description: The average Retail customer can curtail 250 kW during a demand response event. To meet their demand reduction targets, many Retail facilities raise thermostat set points and turn off or dim lighting in common areas and unoccupied spaces. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Average Kw: 250
XCustomer Company Sector Lev1: Retail
XCustomer Company Sector Lev2:
Curtailment Strategy: raise thermostat set points and turn off or dim lighting in common areas and unoccupied spaces.
Curtailment Description: The average Retail customer can curtail 250 kW during a demand response event. To meet their demand reduction targets, many Retail facilities raise thermostat set points and turn off or dim lighting in common areas and unoccupied spaces. The Enel X team will work closely with your facility to design a demand response participation plan that maximizes payments and minimizes facility disruption.
Industry Name: Other
Average Kw: 1000
XCustomer Company Sector Lev1: Other
XCustomer Company Sector Lev2:
Curtailment Strategy: No industry-specific output.
Curtailment Description: No industry-specific output.
Average Kw: 1000
XCustomer Company Sector Lev1: Other
XCustomer Company Sector Lev2:
Curtailment Strategy: No industry-specific output.
Curtailment Description: No industry-specific output.